Verifying a lightning protection installation has never been so efficient
Audits and verification according to current standards
Carry out audits and verifications according to current lightning protection standards (IEC 62305 and NFC 17-102:2011)
Edition of reports
Reports are editable and shareable from LPS Manager . Access to histories is immediate.
Planning
Reminders of audit dates enable planning
Benefits
Audit-Verification in LPS Manager
LPS Manager in situ
LPS Manager in office
Audit reports
Auditors
Availability of verifications
From the use of IEC 62-305…
…to the FD C 17 108: 2017
Verification in LPS Manager is a process of photo and written description. In the form of forms, the description is carried out in the direction high (lightning rod) – low (grounding system). The description of surge arresters is also possible for verification of their condition. The description of conductors, grounding systems and equipotential connections is not limited in their number.
On site, using the power of LPS Manager with a smartphone or tablet as an information gathering tool makes the work quick and efficient. The verification report can be edited and shared immediately.
Intended for editing the various elements noted on site in LPS Manager. In fact, LPS Manager makes deferred work possible from any IT tool. LPS Manager is multi-platform, multi OS: Android, iOS, Windows, MacOS for smartphones, tablets and computers
A verification report can be edited and shared from LPS Manager . The report is available and shareable directly in the application or in pdf format or in web page format. Shot details are only available in the app. The reports are customizable (no LPS Manager logo) optionally by folder or by expert subscription.
The folders and their verifications are easily shareable. A new participant can carry out a verification if you give them the right to do so and their intervention will be identified and recorded. There is no limit to shares or stakeholders.
A verification is dated and cannot be modified after its validation. Validation of an audit is only achieved when the verifier has completed the entire process otherwise the audit will remain open. The next check date is reminded to avoid forgetting. All verification histories are available in the application 24/7 to all users who have received the shared folder.
The IEC 62 305 standard being a matter for experts, which you certainly are, LPS Manager does not wish to replace your skills, but rather to support them. The use of LPS Manager in your case would constitute a first step in your design process…
But for the simplest sites, LPS Manager will be a real tool for generating a study quickly with a personalized PDF output.